Batı Coal Enterprises Edirne Project

Our projects, which we have realized all over the world with Cold Formed solutions, continue without slowing down in Turkey.

Our Batı Coal Enterprises Edirne project, which is among the many projects we have realized in Edirne, has been designed according to the climate and weather conditions of Edirne. Many different climate types can be seen in Edirne. Our projects are designed according to these factors, as the severe continental climate of the Balkans affects Edirne and the winters are cold, rainy and snowy.

Our BT Coal Project realized in Edirne was built as 1200 square meters. 800 square meters of this building is designed to be used as a storage and loading area, and 400 square meters as a workshop area. Considering the rainy weather conditions of Edirne, the roof slope was applied as 15%. The drawing and manufacturing process of our project took 3 weeks and the assembly took 15 days.

BT KÖMÜR EDİRNE 1 BT KÖMÜR EDİRNE 1
BT KÖMÜR EDİRNE 2 BT KÖMÜR EDİRNE 2
BT KÖMÜR EDİRNE 3 BT KÖMÜR EDİRNE 3
BT KÖMÜR EDİRNE 4 BT KÖMÜR EDİRNE 4
BT KÖMÜR EDİRNE 5 BT KÖMÜR EDİRNE 5
BT KÖMÜR EDİRNE 6 BT KÖMÜR EDİRNE 6