Edirne Livestock Farm

Our project has been designed in a way that is suitable for nature, of high quality and to provide the most suitable opportunities for our farmers. Our steel structure, which has the advantage of fast assembly, was built in a short time and delivered to its owner.

Our Edirne Livestock Farm project, which was completed in 2020, was built on an area of 8000m2 in the form of 4 separate structures with a span of 80 meters. The production of our project took 2 months. The assembly of our project, which has a very large area, took 1.5 months.

1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9